Image
volume 07 issue 02

A Case Analysis of Hong Kong's High-Rise Building Construction Methods

Abstract

Exotic "According to Anthony et al., structural systems and construction materials are just as scarce in Japan as they are in the United States (1992). In most cases, we can identify or refine the materials and methods used by our Japanese counterparts. Even in Hong Kong, incidents of a similar nature happened. The number is little "tools at one's disposal.

As I oannou and "colleagues (1993) point out, rising building costs are a major concern for the American economy. High construction prices have weakened the construction industry's competitive position, leading to lower capital expenditure and an increase in manufacturing. As a result, many initiatives have been put on hold or abandoned due to a lack of funding.

In the design and construction integration process, it is an important factor (Vanegas 1987), and its wise deployment has a direct impact on the efficacy of the final product (Halpin 1989).

When it comes to saving money, "owners and contractors in Hong Kong are increasingly resorting to new technology. For instance, rather than building from the bottom up, employ a top-down strategy. The use of" high-strength concrete minimizes the size of the column/wall.

Keywords
  • Cost Effective Design,
  • Marketplace,
  • Category Wise Deployment
References
  • CHEW (2001), Construction Technology for Tall Buildings, Singapore University Press, Singapore
  • R.C. Smith and C.K. Andres (1986), Principles and Practices of Heavy Construction, Prentice-Hall
  • C.W. Griffin (1986), Manual of Low-Slope Roof Systems, 3rd Edition, Mc. Graw Hill, New York
  • W. McElroy (1993), Roof Builder’s Handbook, PTR Prentice Hall, New Jersey
  • C.K. Andres (1998), Principles and Practices of Heavy Construction, 5th Edition, Prentice Hall, New York
  • D. T. Coates (1993), Roofs and Roofing Design and Specification Handbook, Whittles, UK
  • S. Hardy (1997), Time-Saver Details for Roof Design, McGraw-Hill, New York
  • H.W. Harrision (1998), Roofs and Roofing: Performance, Diagnosis, Maintenance, Repair and the Avoidance of Defects, Building Research Establishment, Watford, Hert
  • W. Schuller (1990), The Vertical Building Structure, Van Nostrand Reinhold Buildings Department Environmental Report, Hong Kong Government
  • Code of Practice for Site Supervision 2005, Hong Kong Government
  • Technical Memorandum for Supervision Plans 2005, Hong Kong Government
  • Demolition of Buildings 2004 , Hong Kong Government
  • Code of Practice for Foundations, Hong Kong Government
  • Guidelines on the Design and Construction of Bamboo Scaffolds, Hong Kong Government
  • Code of Practice for Precast Concrete Construction 2003, Hong Kong Government
  • Guide to Trench Excavations (Shoring Support and Drainage Measures), Hong Kong Government
  • Geoguide, Hong Kong Government
  • Highway Slope Manual, Hong Kong Government
  • Technical Guidelines on Landscape Treatment and Bio-engineering for Man-made Slopes and Retaining Walls, Hong Kong Government
  • Guidelines on Safe Access for Slope Maintenance, Hong Kong Government
  • General Specification for Civil Engineering Works, 1992 Edition (in a set of 3 Vols), Hong Kong Government
  • Project Administration Handbook, Hong Kong Government
  • Stephen Liang, Study Material for Structural Design 2, The University of Southern Queensland
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

How to Cite

WANG ZHIHUA , W. Z. ., DR. AIMAN AL-ODAINI , D. A. A.-O. ., & DR HJ ARAZI BIN IDRUS , D. H. A. B. I. . (2024). A Case Analysis of Hong Kong’s High-Rise Building Construction Methods. International Journal of Multidisciplinary Research and Studies, 7(02), 67–72. Retrieved from https://www.ijmras.com/index.php/ijmras/article/view/728

Download Citation

Downloads

Download data is not yet available.

Most read articles by the same author(s)

Similar Articles

You may also start an advanced similarity search for this article.